![]() |
Coming along nicely [cl
??[P?? |
Looking good!! Moving g along nicely!
|
2 Attachment(s)
Frame construction done, getting started on building the cab, 1x1x.063 tubing [;)
http://ratrodsrule.com/forum/attachm...6&d=1651622857http://ratrodsrule.com/forum/attachm...7&d=1651622857 |
This is a great tutorial.
|
Quote:
|
Good stuff for sure.
[P[P[P |
Quote:
Thankfully I have pics of how it was built and have it in the other garage to reference from. |
[cl:D:cool:
[P[P[P Torchie |
2 Attachment(s)
Headers showed up today, they fit right in, 'cause they're made to fit the F100.
Clutch linkage is no problem but may need to move one pipe to get the steering shaft through - have to wait 'till the steering column goes in to sort that out.... http://ratrodsrule.com/forum/attachm...9&d=1651710448http://ratrodsrule.com/forum/attachm...0&d=1651710448 |
[P[;)[P
|
All times are GMT -5. The time now is 04:24 AM. |
Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2023, vBulletin Solutions, Inc.
Rat Rods Rule Inc.