Undead Sleds / Rat Rods Rule - Hot Rods, Rat Rods, Sleepers, Beaters & Bikes... since 2007!

Go Back   Undead Sleds / Rat Rods Rule - Hot Rods, Rat Rods, Sleepers, Beaters & Bikes... since 2007! > Electrical... Talk & Q&A!

Electrical... Talk & Q&A! Electrical Q&A.. The shocking truth, tips, tricks & more!

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 11-01-2019, 10:23 AM
serrata serrata is offline
Member
 
Join Date: May 2012
Location: Orlando, FL
Posts: 91
Default

If I run the batteries to the back, it would be a 14' to 16' run to the front of the engine depending on the route. What gauge cable would I use? Would I run 10gauge?
I like the idea of putting a set of terminals or quick connects up front for access. I think I'll do that.
Reply With Quote
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -5. The time now is 12:46 AM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2023, vBulletin Solutions, Inc.
Rat Rods Rule Inc.