1949 Ford bobber build

Rat Rods Rule

Help Support Rat Rods Rule:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
that took a while...

Primed. The Hood is drying in the garage right now. Still need to do the inside of the cab.

All metal. No filler.

Work kinda took over for a while there but I have made some progress. Hoping to wire and install the glass this winter.
 

Attachments

  • IMG_2746.jpg
    IMG_2746.jpg
    116.8 KB · Views: 53
copper plating

busy week. I have figured out how to copper plate my rear signal light brackets. The bottom is unplated. I have been able to plate SS and previously chromed items in test mode ... so you may see the direction this is going:)
 

Attachments

  • IMG_2747.jpg
    IMG_2747.jpg
    84.5 KB · Views: 29
Thanks for the link Gold! Here's the link to the US site:

https://www.caswellplating.com/

I took a little look around, sounds interesting. I was thinking about later on setting up a small powdercoat operation here at home for some extra $$$$ after I retire, may look into a small scale plating operation, too. Doubt I'd ever do anything as big as a bumper, but small stuff like grilles, mirrors, door handles, etc might not be too hard to do. Don't know if I'll ever do it or not, but good to know where you can supplies if I wanted to.
 

Latest posts

Back
Top