sgtpontiac
Older, Wiser and Still Buildin'
I now have air throughout the shop....won't know what to do if I'm not tripping over hoses.... used a hand threader to make the lengths I needed...I used black pipe....no PVC...considered galvanized but since I had a crap ton of 3/4" black pipe already, I only needed to buy 5 more 10' lengths to finish....that and T's, connectors and air fittings...I've got 4 down tubes total with ball valve drains, 6 air fittings/couplers and one into the storage area thru the wall...ran them so the water will drain back to the down/drain tubes...works darn well....had water issues even with the filter and seperator but now nothing at the hose no matter what....I'll get some pic's posted....have about 200 bucks invested in everything....would have been more had i not had 45' of pipe already...had a ton of hose, made a few 25' lengths and then one 50' length for running in the work area which will go anywhere I need it in the storage area.....